Deltadesh Projects

Deltadesh has been involved in a wide variety of projects:

Phase I : Construction Project Management Consultancy (PMC)




































Phase II : Development & Management

sm-building

  • Accomodation, Office & Security Block on Gas Drilling site
    Tullow Oil Bangladesh Limited

    • – total design & project management;
    • – electrical design and implementation;
    • – HVAC design & implementation
  • Establishment of the James P. Grant School of Public Health
    BRAC James P. Grant School of Public Health;

    • – Architecture & design
    • – working drawings
    • – writing of tender document
    • – pre-qualification contractors
    • – tendering & selection of contractor
    • – design of HVAC system
    • – total project & quality management
    • – electrical design & implementation
    • – generator & sub-station calculation and procurement
    • – total budget control
  • Clinic Extensionicddr,b travellers clinic (ongoing)
    • – Design of the medical facility
    • – medical equipment specification and BoQ in consultation with operating doctors
    • – advising on implementation management procurement
  • Dutch-Bari DevelopmentDutch investor in real estate
    • – establishment of the company
    • – permissions, legal services and permits
    • – total project & quality management
    • – feasibility plan
    • – financial model
    • – construction and quality control

Phase III : Technical Assistance

3d sketch of a four-room apartment

  • Strengthening Enterprise Development ProgramWoord & Daad / CSS, 2010
    • – Enterprise development evaluation
    • – development of various enterprise models
  • Interior Design of 35,000 sq. ft. Garment House Triton Textile, 2010 (ongoing)
    • – Project design
    • – technical advice
    • – design of HVAC system
    • – total quality management
    • – fire fighting system; access control system
    • – generator & substation 1 MW
  • German-Bangla Bicycle Factory
    • – development of new model of bicycles for Dutch customers
    • – increase of production quality through technical training
  • Total RenovationResidence of the Dutch ambassador, 2009
    • -total project & quality management

Phase IV : Design & Implementation

office-1

  • Total RenovationRoyal Netherlands Embassy, 2010
    • – Architecture & design
    • – working drawings
    • – writing of tender document
    • – pre-qualification contractors
    • – tendering & selection of contractor
    • – design of HVAC system
    • – total project & quality management
    • – electrical design & implementation
    • – generator & sub-station replacement
    • – total budget control
    • – supervision of five contractors
  • Total Renovation Residence of the Swiss ambassador, ongoing
    • – Architecture & design
    • – working drawings
    • – writing of project specifications and BoQ
    • – tendering & selection of contractor
    • – total project & quality management
    • – electrical design & implementation
    • – generator calculation & procurement
    • – total budget control
  • Factory of Kazi & Kazi TeaGemcon Group, 2009
    • – total interior design & implementation
    • – total project management
    • – electrical design and implementation
    • – access control & security system
  • Factory SetupBengal Herbal Garden Ltd., 2009
    • – total interior design & implementation
    • – total project management
    • – electrical design & implementation
    • – design of access control & security system
  • Prefabricated Steel Structure BuildingBritish American Tobacco, 2010
    • – Total design & project management
    • – quality monitoring of the construction
    • – supply and erection of the steel structure building
  • Prefabricated Steel Structure Building Beximco, 2010
    • – Total design & project management
    • – quality monitoring of the construction
    • – supply and erection of the steel structure building